|
The Guido Estate is a 900 hectare land recently awarded to heirs of Guido by
the Supreme Court Ruling.
This is located in Antipolo Rizal along the Laguna Bay Coast. Laguna Bay drains
to Manila Bay via the Pasig River. The WaterBus Stage 1 will ply the Laguna Bay,
Pasig River, Manila Bay Route. The Manila Bay main terminal is the Pulang Lupa
properties.
The end terminal on the Laguna Bay is the Guido Estate. The Guido Estate will
be a full transmigration site with main industry being University Technological
Park.
This will provide the need of current universities in the Philippines for
expansion area because Manila Campuses are not congested. Other international
universities are also considered. Those that have leaning to physical deliveries
like agriculture, mining, aquaculture food production and natural resources
technologies and manufacturing.
|